Chapter 4.32
Product |
Shipley S1818 Positive Photoresist |
OCG 825 35CSPositive Photoresist G-Line |
OCG Oi R-897 10i Positive
Photoresist I-Line |
|
|
1.5 – 2.2 |
1 – 2.2 |
0.8 – 2.2 |
|
Spin
Speed (RPM): Time: Tool: Dispense: |
5500 30 sec. (spinner1) Static or Dynamic
|
5000 30 sec. (svgcoat1 & 2) Dynamic - 500RPM |
4100 30 sec. (svgcoat1 & 2) Dynamic - 500RPM |
|
Thickness (µm) |
1.65 |
1.3 |
1.1 |
|
Prebake: Temp: Time: |
Vacuum Hotplate 110 ± 5ºC 45 ± 5 sec. Or Convection oven 95 ± 5ºC 30 min. |
Vacuum Hotplate 90ºC 90 sec. Or VWR Oven 95 ± 5ºC 25 min. ± 5 min. |
VWR Oven 90ºC 1 min. (same) |
|
Exposure-
Required Energy (mJ/cm2): Time: |
~150 ~ 2 sec. |
~ 218 ~ 2.9 sec. |
~ 213 ~ 2.9 sec. |
|
Post
Exposure Bake (PEB) Method: Bake
Temp: Bake
Time: Chill Time: |
N/A |
svgdev Developer Program 8 + Bake Program 1 (PEB) 120ºC 60 sec. 6 sec. |
svgdev Developer Program 8 + Bake Program 1 (PEB) 120ºC 60 sec. 6 sec. |
|
Developer: Method: Temp: Time: |
Shipley Microposit MF-319 Immersion ~21.2ºC 1 min. |
OCG 934 2:1 premixed svgdev/puddle ~21.2ºC 1 min. |
OPD-4262 premixed svgdev/puddle ~21.2ºC 1 min. |
|
Hard
Bake: Method: Temp: Time: or UV Bake: Method: Temp: Time: |
VWR Oven 115 ± 5ºC 30 min. Refer to UV bake System recipes |
VWR Oven 120ºC 30 min. Refer to UV bake System recipes |
VWR Oven 120ºC 30 min. Refer to UV
bake System recipes |
|
Stripper: Method: Temp: Time: |
PRS-3000 Sink5 80ºC 5 min. |
PRS-3000 Sink5 80ºC 5 min |
PRS-3000 Sink5 80ºC 5 min. |
|
Rinse: Method: Time: |
DI H2O QDR 2 cycles |
DI H2O QDR 2 cycles |
DI H2O QDR 2 cycles |
|
DRY: Method: Time: |
Spindryer3 Recipe 1 1 min. |
Spindryer3 Recipe 1 1 min. |
Spindryer3 Recipe 1 1 min. |
Product |
Rohm Haas SPR-220-7.0 |
Shipley UV210-0.6 DUV Positive Photoresist |
Shipley UV26-2.0 DUV Positive
Photoresist |
|
|
7 - 12 |
0.4 – 1 |
1 – 2.0 |
|
Spin
Speed (RPM): Time: Tool: Dispense |
1800 30 sec. SVGG-1, svgcoat1 & 2 Static |
6000 30 sec. (svgcoat6) Dynamic – 500 RPM |
2500 30 sec. (svgcoat6) Dynamic – 500 RPM |
|
Thickness (µm) |
10 |
.42 |
2.2 |
|
Prebake: Temp: Time: |
115 ± 1ºC 300 sec. |
Proximity 130 ± 1ºC 1 min. |
Proximity 130 ± 1ºC 1 min. |
|
Exposure-
Required Energy (mJ/cm2): Time: |
~300 mJ/cm2 at 20 mW/cm2 should expose ~15 seconds |
15 to 30 –- |
15 to 30 – |
|
Post
Exposure Bake (PEB) Method: Bake
Temp: Bake
Time: Chill
Time: |
Wait at least 30 minutes after exposure before
performing PEB 115 ºC – 6.5 minutes hotplate |
Vacuum hotplate 130ºC 1 min.. 6 sec. |
Vacuum hotplate 110ºC 60 sec. 6 sec. |
|
Developer: Method: Temp: Time: |
Rohm Haas LDD-26W Tank develop – 3-15 minutes slight agitation |
Shipley LDD-26W Svgdev6 spray/puddle ~21.5ºC 1 min. |
Shipley LDD-26W svgdev6 spray/puddle ~21.5ºC 1 min. |
|
Hard
Bake: Method: Temp: Time: or UV Bake: Method: Temp: Time: |
Hot plate 80 ºC 15 min UVbake not compatible with thick resists |
VWR Oven 120ºC 30 min. Refer to UV bake System recipes |
VWR Oven 120ºC 30 min. Refer to UV
bake System recipes |
|
Stripper: Method: Temp: Time: |
PRS-3000 Sink5 80ºC 30 min. or Matrix Plasma 2 min. 30 sec. |
PRS-3000 Sink5 80ºC 5 min. or Matrix Plasma 1 min. 30 sec. |
PRS-3000 Sink5 80ºC 5 min. or Matrix Plasma 2 min. 30 sec. |
|
Rinse: Method: Time: |
Manual DI H2O rinse |
DI H2O QDR 2 cycles |
DI H2O QDR 2 cycles |
|
DRY: Method: Time: |
manual dry - gently with N2 gun |
Spindryer3 Recipe 1 1 min. |
Spindryer3 Recipe 1 1 min. |
Table 2
Other
Strippers and Thinners
Stripper
|
Thinner |
|
Shipley SVC-14 Positive
Resist Stripper (Recommended for DUV photoresist Shipley Microposit Remover
1165 (General positive photoresist stripper) |
Microposit Thinner Type A |