Chapter 5.11
Tystar11
MOS Clean LTO LPCVD Furnace (4” and 6”)
(tystar11)
Tystar11 is
a 6” LPCVD tube, which is maintained for MOS-clean LTO / PSG processes. This tube is capable of processing both 4” and
6” wafers
5.1
MOS tube: Tystar11 is a MOS clean tube dedicated to IC type
fabrication (MOS clean).
5.2
LPCVD: Low pressure chemical vapor deposition
5.3
LTO: Low temperature silicon dioxide.
5.4
PSG: Phospho-silicate glass
5.5
Silane (SiH4): A gas used
in our LTO (doped & undoped) processes.
5.6
Phosphine (PH3): A gas used in our doped LTO process (PSG).
5.7
Oxygen: A gas used
in LTO (doped & undoped) processes.
5.8
ROP: Remote-operation panel.
5.9
ALMACK: Alarm Acknowledge is a button used to proceed to
next step in recipe.
5.10
ABORT: This key can be used to abort the process. This is
commonly used for unloading the wafers, where users invoke the recipe again,
after run has been completed and properly vented. The tube will open for the
users to unload their wafers followed by abort to load the standby recipe, and
before leaving the area.
Machine interlock messages
5.11
ANTLK: Above
atmosphere interlock, no process gas can flow (including N2).
5.12
BNTLK: Below
process pressure interlock, no process gas can flow.
5.13
DNTLK: Door
interlock, door is not closed; no process gas can flow.
5.14
GNTLK: Gate valve
interlock, gate valve is not open, no process gas can flow.
5.15
VNTLK: Vacuum
interlock, pump problem, no process gas can flow.
Pertinent information can
be found on the following sites:
7.1
Process monitoring test
section of the Microlab’s home page.
7.2
Problem and comments
section under equipment section of the wand.
7.3
Enable message for
Tystar11.
Tystar11 tube is assigned to LTO/PSG processes (undoped and Phosphorous doped, respectively). There are three main recipes available on the tool. This includes standard doped and undoped LTO as well as a variable doped recipe. The latter allows for the user to change the value of phosphine gas used in the recipe. These recipes have an additional step (70), which sets the proper K value to speed up the temp stabilization process.
8.1
Standard undoped LTO
process: The standard 11sultoa recipe uses fixed amount of Silane and
Oxygen, no Phosphine to deposit low temperature silicon dioxide film at around
450ºC.
8.2
Standard fixed doped
LTO process (PSG): The standard 11sdltoa recipe uses fixed amount of
Silane, Oxygen and Phosphine to deposit phospho-silicate glass film (PSG) at
450ºC.
8.3
Variable PSG process:
The variable 11vdltoa recipe provides the flexibility to change the
amount of phosphine, silane and oxygen gases in the recipe, therefore, varying
the amount of phosphorous in the final film (PSG).
8.4
Deposited PSG film is
porous, therefore it is highly recommended to immediately anneal the film,
after deposition. This should prevent moisture absorption and possible
crystallization.
8.5
This tube is calibrated
at 450ºC. Do not attempt to run any processes above 500ºC.
8.6
Available gases on this
tube are Silane (SiH4), Phosphine (PH3), Oxygen (O2),
Nitrogen (N2) and Nitrogen (N2) VAC.
9.2.1
Recipes: Tystar11
recipes are residing on a dedicated diskette marked as Tystar11 recipes. These recipes have a standard format with
three pump and purge cycles before and after the deposition step. This is
designed to better control the film particles by keeping the tube cleaner.
There is also an additional temperature stabilization step incorporated into
these recipes, which is designed to optimize the ramp up time towards the
target deposition temperature. Six recipes are available on this furnace which are: standard undoped LTO; standard doped LTO
(PSG); standard variable LTO; standby; vent and purge recipes. The vent and
purge recipes are designed to speed up recovery process.
See Appendix 2 for more
details on the available recipes.
|
11sultoa recipe 11sdltoa recipe 11vdltoa recipe 11lto400 11stnbya recipe 11purge recipe 11Vent recipe |
Standard undoped
LTO, fixed SiH4 and O2. Standard doped LTO
(PSG), fixed SiH4, O2 and PH3. Variable doped LTO
(PSG), variable PH3 , SiH4 and O2 gases. Undoped LTO, fixed
temperature at 400 ºC. Standby recipe should
be loaded after you are done. Additional recipe
available to purge and vent the tube.* Additional recipe
available to vent the tube.* |
Note
(*): The vent and purge recipes can be used for quick
vent or pump/purge cycles. The abort as you know, takes the recipe back to its
first step. This may take a long time for the tube to vent. This is because the
initial step bleeds only about one liter of nitrogen into the tube, in which
case it takes a long time to bring the tube to atmosphere. This can be
accomplished much faster by loading one of the two recipes noted above, however
take extreme care and make sure that you do not use the vent recipe when
harmful gases are present (abort at deposition step), load the purge recipe
instead. This can come handy when the abort has occurred, while still in
deposition step or if the origin of the abort sequence is not known. (Did it
abort at deposition step?)
9.2.2
Recipe modification and
new recipe generation: As always, modification to standard recipes is not
allowed. Talk to process staff if you need to develop special application
recipes.
9.2.3
Check standby recipe is
running. Press ALMACK twice and wait 12 minutes for the tube to vent.
9.2.4
Recipe Loading: Type LO followed by recipe name and 11 to
load the recipe onto the tube from Tycom terminal. e.g. LO 11sultoa 11
9.2.5
Running recipe: Once
the recipe is loaded you can type RU followed by tube number 11 or simply press
run button on the ROC terminal.
9.2.6
Wafer Loading: Once the
boat is out, replace dummy wafers with your work wafers. There is a 20 minutes
window available for this task. Once the 20 minutes elapses, the boat loader
will automatically go in. Do not worry, simply ALMACK through, cycle back to boat
unload step and wait for the boat to come out. You have another 20 minutes to load your wafers.
9.2.7
Unloading wafers. Once
the process is completed the furnace will wait in flush and hold step. You will
need to ALMACK twice out of this step to vent the tube. You will need to run
the recipe again, so that the boat loader will bring the tube out. You will
then need to ALMACK to send the boat in and wait for the door to completely
close. You can then abort the process and load the standby recipe, before
signing off.
9.2.8
Standby recipe
(finishing up): Once your run is completed and your work wafers are out, you
will need to load and run the standby recipe 11stnbya.
10.0
Troubleshooting
Guidelines
10.1
Failed Leak
Check
10.1.1
Check the machine
status screen on the Tycom terminal (type in DI ST 11).
10.1.1.1
If GNTLK or VNTLK
is ON, stop and report it as fault.
10.1.1.2
If DNTLK is ON, vent
the tube. Run the process again. Try this a couple of times, if necessary.
Report as fault, if still fails. There may be door sensor problems.
10.1.1.3
If no interlock is ON,
vent the tube wipe the door and the o-ring. Run the process again. If it still
fails, report it as fault.
10.2
No Process Gas
Flow
10.2.1
Check the machine
status screen on the Tycom terminal (type in DI ST 11).
10.2.1.1
If any interlock is ON,
report it as fault.
10.2.1.2
Check the appropriate
gas cylinder, if empty report as fault.

Recipes
11sultoa 11sdltoa
|
Step --------- 01 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 |
Description -------------------------------------- Initialize & system
check Unload alarm Unload Boat Load on almack Load alarm Load boat Check door closed Pump1 Purge1 Pump2 Purge2 Pump3 Leak check Ramp to temp Set K Variable Temp stabilize Temp check Pump4 Process gas flows Pressure set (300 mTorr) Deposition
step (PH3 = 0) Pump1 Purge1 Pump2 Purge2 Pump3 Purge3 Flush and hold Branch to backfill Loop back to flush &
hold Backfill-1 Backfill-2 End |
Time ----------- N/A 3 sec 10 min 20 min 3 sec 10 min 2 min 5 min 2 min 2 min 2 min 2 min 1 min 30 min 1 min 5 min 5 min 2 min 1 min 1 min Variable 2 min 2 min 2 min 2 min 2 min 2 min 1 hr 5 sec 1 sec 5 min 7 min N/A |
|
Step --------- 01 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 |
Description ---------------------------------------- Initialize & system
check Unload alarm Unload Boat Load on almack Load alarm Load boat Check door closed Pump1 Purge1 Pump2 Purge2 Pump3 Leak check Ramp to temp Set K Variable Temp stabilize Temp check Pump4 Process gas flows Pressure set (300 mTorr) Deposition
step (PH3 = fix) Pump1 Purge1 Pump2 Purge2 Pump3 Purge3 Flush and hold Branch to backfill Loop back to flush &
hold Backfill-1 Backfill-2 End |
Time ----------- N/A 3 sec 10 min 20 min 3 sec 10 min 2 min 5 min 2 min 2 min 2 min 2 min 1 min 30 min 1 min 5 min 5 min 2 min 1 min 1 min Variable 2 min 2 min 2 min 2 min 2 min 2 min 1 hr 5 sec 1 sec 5 min 7 min N/A |
11vdltoa 11stnbya
|
Step --------- 01 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 |
Description --------------------------------------------- Initialize & system
check Unload alarm Unload Boat Load on almack Load alarm Load boat Check door closed Pump1 Purge1 Pump2 Purge2 Pump3 Leak check Ramp to temp Set K Variable Temp stabilize Temp check Pump4 Process gas flows Pressure set (300 mTorr) Deposition
step (PH3 = variable) Pump1 Purge1 Pump2 Purge2 Pump3 Purge3 Flush and hold Branch to backfill Loop back to flush &
hold Backfill-1 Backfill-2 End |
Time ----------- N/A 3 sec 10 min 20 min 3 sec 10 min 2 min 5 min 2 min 2 min 2 min 2 min 1 min 30 min 1 min 5 min 5 min 2 min 1 min 1 min Variable 2 min 2 min 2 min 2 min 2 min 2 min 1 hr 5 sec 1 sec 5 min 7 min N/A |
|
Step ------- 01 05 10 15 20 25 30 35 40 45 50 55 60 |
Description ------------------------------- Initialize Load Check door closed Short pump De-gas pump Hard pump Leak check Standby Branch to backfill-1 Loop back to standby Backfill-1 Backfill-2 end |
Time ------------ N/A 10 min 2 min 2 min 10 min 2 min 1 min 1 hr 5 sec 1 sec 5 min 7 min N/A |
Tystar 11-12 Study Guide
Be sure to know…
1.
Tystar 11 is MOS-clean; Tystar 12 is non-MOS clean.
2.
Unloading wafers and leaving the tube in standby.
3.
The meaning of the interlocks: DNTLK, GNTLK, VNTLK.
4.
Safety concerns if process is aborted in deposition step.
5.
Difference between recipes: 11SULTOA, 11SDLTOA, and 11VLTOA.
6.
How to set up a new recipe.
7.
If you ABORT before boat loading is complete.
8.
Unloading wafers after deposition.
9.
The meaning and purpose of pump and purge.
10.
Loading wafers: time limits and extending loading time.
11.
If the tube fails leak check.
12.
If there is no process gas flow.