Chapter 5.9
Tystar9
MOS Clean Silicon Nitride (Si3N4)
LPCVD
Furnace (4” and 6”)
(tystar9)
1.0 Title
Tystar9 MOS Clean Silicon Nitride (Si3N4) LPCVD Furnace (4” and 6”)
2.0 Purpose
This document has specific information about Tystar9, our 6” LPCVD silicon nitride deposition tool. For general information on LPCVD furnaces, please refer to Chapter 5.0 of the lab manual, operation and pertinent information.
5.1
MOS tube: Tystar9 is a
MOS clean tube dedicated to IC type of fabrication.
5.2
HTO:
High temperature oxide deposition process available in the Tystar9 LPCVD tube.
5.3
Dichlorosilane
(SiCl2H2) commonly referred to as DCS: A gas used in our nitride and HTO processes.
5.4
Ammonia
(NH3): A gas used in our nitride process.
5.5
Nitrous
oxide (N2O): A gas used in our HTO.
5.6
ROP:
Remote-operation panel.
5.7
ALMACK
: alarm acknowledge is a button used to
proceed to next step in recipe.
5.8
ABORT:
This key can be used to abort the process. This is commonly used for unloading
the wafers, where users invoke the recipe again, after run has been completed
and properly vented. The tube will open for the users to unload their wafers
followed by abort to load the standby recipe, and before leaving the area.
Machine
interlock messages
5.9
ANTLK: Above atmosphere interlock, no process gas
can flow (including N2)
5.10
BNTLK: Below process pressure interlock, no process
gas can flow.
5.11
DNTLK: Door interlock, door is not closed; no
process gas can flow.
5.12
GNTLK: Gate valve interlock, gate valve is not open,
no process gas can flow.
5.13 VNTLK: Vacuum
interlock, pump problem, no process gas can flow.
6.0 Safety
Pertinent information can be
found on the following sites:
7.1 Process
monitoring test section of the Microlab’s home page.
7.2 Problem
and comments section under equipment section of the wand.
7.3 Enable
message for Tystar9.
8.0
Available
Processes and Gases
Tystar9
tube is assigned to standard nitride processing. HTO is also available for
special application.
8.1
Silicon Nitride
processes. The standard 9snita
recipe uses DCS and NH3 to deposit silicon nitride at 800ºC.
8.2
High temperature oxide
(HTO) process: There is a recipe available for this process that can deposit
relatively good quality oxide by reacting N2O and DCS at elevated temperatures.
This process however creates high amounts of byproducts and should not be
frequently used, as it can clog up the system.
8.3
This tube is calibrated
in the 500ºC –800ºC range. Do not
attempt to run any processes outside of this temperature range, especially
process temperatures above 800ºC are
not allowed. This could damage the heating element.
8.4
Available gases on this
tube are DCS, NH3, N2O, N2 and N2
VAC.
9.2.1
Recipes: Tystar9
recipes are residing on a dedicated diskette marked as Tystar9 recipes. These recipes have a standard format with
three pump and purge cycles before and after the deposition step. This is
designed to better control the film particles by keeping the tube cleaner.
There are standard nitride and HTO recipes available on Tystar9 disk, as well
as standby, vent and purge recipes. The vent and purge recipes are designed to speed
up recovery process.
See Appendix 2 for more details on the available recipes.
|
9snita: Standard
nitride process, fixed NH3 and DCS. 9vnita: Variable
nitride recipe, variable NH3 and DCS. 9VHTOA: Variable
high temp oxide recipe, variable N2O and DCS. 9STNBYA: Standby
recipe to be used post nitride deposition run. 9PURGE: Additional
recipe available to purge and vent the tube.* 9VENT: Additional
recipe available to vent the tube.* |
Note (*): The vent and purge recipes can be
used to for quick vent or pump/purge cycles. The [abort] as you know, takes the
recipe back to its first step. This may take a long time for the tube to vent. This
is because the initial step bleeds only about one liter of nitrogen into the
tube, in which case it takes a long time to bring the tube to atmosphere. This
can be accomplished much faster by loading one of the two recipes noted above,
however take extreme care and make sure that you do not use the vent recipe
when harmful gases are present (abort at deposition step), load the purge
recipe instead. This can come handy when the abort has occurred, while still in
deposition step or if the origin of the abort sequence is not known (did it
abort at deposition step?).
9.2.2
Recipe modification and
new recipe generation: As always, modification to standard recipes is not
allowed. There are HTO and variable nitride recipes available on the TYSTAR9
diskette. Talk to process staff if you need to develop other recipes.
9.2.3
Recipe Loading: Type LO followed by recipe name and 9 to
load the recipe onto the tube from Tycom terminal. e.g. LO 9snita
9
9.2.4
Running recipe: Once
the recipe is loaded you can type RU followed by tube number (9) or simply press run button on the ROC
terminal.
9.2.5
Wafer Loading: Once the
boat is out, replace dummy wafers with your work wafers. There is a 20 minutes
window available for this task. Once the 20 minutes elapses, the boat loader
will automatically go in. Do not worry, simply ALMACK through to cycle back
to boat unload step and wait for
the boat to come out. You have another
20 minutes to load your wafers.
9.2.6
Unloading wafers. Once
the process is completed the furnace will wait in flush and hold step. You will
need to ALMACK twice out of this step to vent the tube. You will need to run
the recipe again so that the boat loader will bring the tube out. You will then
need to ALMACK to send the boat in and wait for the door to completely close.
You can then abort the process and load the proper standby recipe, before
signing off. For a completed nitride recipes, load 9stnbya and press run.
10.0 Troubleshooting Guidelines
10.1 Failed Leak Check
10.1.1 Check the machine status
screen on the Tycom terminal (type in DI ST 9).
10.1.1.1 If GNTLK or VNTLK is ON, stop and
report it as fault.
10.1.1.2 If DNTLK is ON, vent the tube. Run the process
again. Try this a couple of times, if necessary. Report as fault, if still
fails. There may be door sensor problems.
10.1.1.3 If no interlock is ON, vent the tube wipe the door
and the o-ring. Run the process again. If still fails report it as fault.
10.2
No Process Gas
Flow
10.2.1
Check the machine
status screen on the Tycom terminal (type in DI ST 9).
10.2.1.1 If
any interlock is ON, report it as fault.
10.2.1.2 Check the appropriate gas cylinder, if empty
report as fault.

9snita
|
|
9vnita
|
||||
|
Step ------- 01 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 |
Description
--------------------------------------- Initialize & system check Unload Boat Load alarm Load on almack Load boat Check door closed Pump1 Purge1 Pump2 Purge2 Pump3 Leak check Ramp to temp Temp stabilize Temp check Pump4 NH3 flow (75 sccm) Pressure set (300 mTorr) Pressure stabilization DCS flow (25 sccm) Deposition step NH3 purge Pump1 Purge1 Pump2 Purge2 Pump3 Purge3 Flush and hold Branch to backfill Loop back to flush & hold Backfill-1 Backfill-2 End |
Time
----------- N/A 10 min 5 sec 20 min 10 min 2 min 5 min 2 min 2 min 2 min 2 min 1 min 1 hr 2 min 5 min 2 min 1 min 1 min 1 min 1 min Variable 5 min 2 min 2 min 2 min 2 min 2 min 2 min 1 hr 5 sec 1 sec 5 min 7 min |
|
Step
------- 01 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 |
Description
----------------------------------------- Initialize & system check Unload Boat Load alarm Load on almack Load boat Check door closed Pump1 Purge1 Pump2 Purge2 Pump3 Leak check Ramp to variable temp. Temp stabilize Temp check Pump4 NH3 flow (STD 75 sccm) Pressure set (300 mTorr) DCS flow (25 sccm) Deposition step NH3 purge Pump1 Purge1 Pump2 Purge2 Pump3 Purge3 Flush and hold Branch to back fill Loop back to flush & hold Backfill-1 Backfill-2 End |
Time
----------- N/A 10 min 5 sec 20 min 10 min 2 min 5 min 2 min 2 min 2 min 2 min 1 min Variable 2 min 5 min 2 min Variable 30 sec 1 min Variable Variable 2 min 2 min 2 min 2 min 2 min 2 min 1 hr 5 sec 1 sec 5 min 7 min |
9vhtog
|
|
|
9stnbya
|
|
|||
|
Step -------- 01 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 |
Description
------------------------------------------------------- Initialize &
system check Unload Boat Load alarm Load on almack Load boat Check door closed Pump1 Purge1 Pump2 Purge2 Pump3 Leak check Ramp to temp Temp stabilize Temp check Pump4 N2O flow (Variable,
STD 100 sccm) Pressure set
(variable, STD 300 mTorr) DCS flow (Variable,
STD 20 sccm) Deposition step N2O purge Pump1 Purge1 Pump2 Purge2 Pump3 Purge3 Flush and hold Prepare to back fill Loop back to flush
& hold Backfill-1 Backfill-2 End |
Time
----------- N/A 10
min 5
sec 20
min 10
min 2
min 5
min 2
min 2
min 2
min 2
min 1
min Variable 2
min 5
min 2
min Variable 1
min 1
min Variable Variable 2
min 2
min 2
min 2
min 2
min 2
min 1
hr 5
sec 1
sec 5
min 7
min |
|
Step ------- 01 05 10 15 20 25 30 35 40 45 50 55 60 |
Description
---------------------------------- Initialize Load Check
door closed Short
pump Degas
pump Hard
pump Leak
check Standby Branch
to soft vent Loop
back to standby Backfill-1 Backfill-2 End |
Time
---------- N/A 10
min 2
min 2
min 10
min 2
min 1
min 1
hr 5
sec 1
sec 5
min 7
min |
|
|
|||||||
|
|||||||
Tystar 9 Study
Guide
Be sure to know…
1. MOS-clean
vs. non-NOS-clean rules
2. Gases
used for nitride and HTO deposition
3. Loading
and unloading wafers
4. What
each interlock message means
5. 9purge
vs. 9vent recipes and safety concerns
6. Procedure
for writing a new recipe
7. Maximum
temperature allowed
8. Venting
the tube
9. Additional
pump and purge cycles
10. Which
standby recipe to use after n`*itride and HTO
11. Wafer
loading time
12. Leak
check failure and troubleshooting
13. Control
panel button function
14. Checking
tube status