150mm Retooling Expenditures |
|
|
|
|
|
Paid by Microlab Funds |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Photo/Mask |
|
Wet Processing |
|
Thermal
Processing |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
APT chrome/emul |
$ 19,500.00 |
|
sink3/4/6/8/srd |
$ 37,202.00 |
|
tystar1-4 |
$ 149,198.00 |
|
|
|
|
ASML |
$ 8,609.00 |
|
sink5/7/srd |
$ 107,500.00 |
|
tystar9-12 |
$ 386,570.00 |
|
|
|
|
GCA wafer stepper6 |
$ 16,272.00 |
|
sink9/srd6 |
$ 45,400.00 |
|
tystar13-16 |
$ 49,146.00 |
|
|
|
|
SVG 8800 coat/dev |
$ 71,300.00 |
|
Cassettes/handling equipment |
$ 4,990.00 |
|
tystar17 |
$ 70,942.00 |
|
|
|
|
SVG coat3 |
$ 2,672.00 |
|
HF Disposal (pump cart) |
$ 12,300.00 |
|
tystar18 |
$ 24,300.00 |
|
|
|
|
Matrix asher |
$ 6,600.00 |
|
Acid Waste Disposal System |
$ 42,800.00 |
|
tystar19 |
$ 18,549.00 |
|
|
|
|
uvbake |
$ 12,700.00 |
|
Tube cleaning station |
$ 2,542.00 |
|
tystar20 |
$ 11,417.00 |
|
|
|
|
Quintel mask aligner |
$ 5,800.00 |
|
|
|
heatpulse |
$ 5,196.00 |
|
|
|
|
|
|
|
|
|
LPCVD Exhaust Upgrade |
$ 17,129.00 |
|
|
|
|
Total |
$ 143,453.00 |
|
Total |
$
252,734.00 |
|
Total |
$
732,447.00 |
|
|
|
|
Etch |
|
Thin Films |
|
Computers |
|
|
|
|
|
|
|
|
|
|
|
Lams1-5 |
$ 35,325.00 |
|
CPA |
$ 3,000.00 |
|
Server Upgrade (silicon) |
$ 77,900.00 |
|
|
|
|
Centura |
$ 127,954.00 |
|
Novellus (rm 144) |
$ 76,500.00 |
|
Microlab LAN (CAPE) |
|
|
|
|
|
XeF2 Etcher |
$ 7,056.00 |
|
P5000 (rm 190) |
$ 89,400.00 |
|
Equip Control (WIS) |
|
|
|
|
|
|
|
Edwards EB3 evaporator |
$ 13,800.00 |
|
Fac. Monitoring (RUMS) |
|
|
|
|
|
|
|
|
Edwards sputterer |
$ 5,000.00 |
|
|
|
|
|
|
|
|
|
Oxford2 PECVD |
$ 1,900.00 |
|
|
|
|
|
|
Total |
$ 170,335.00 |
|
Total |
$
189,600.00 |
|
Total |
$
77,900.00 |
|
|
|
|
Planarization |
|
Measurements |
|
Utilities |
|
|
|
|
|
|
|
|
|
|
|
Strausbaugh cmp |
$ 18,600.00 |
|
autoprobe |
$ 5,900.00 |
|
LN Vessels (1/3 share) |
$ 19,500.00 |
|
|
|
|
SSEC cmp wafer cleaner |
$ 31,504.00 |
|
cdsem |
$ 20,400.00 |
|
LN Vessels Install |
$ 11,100.00 |
|
|
|
|
|
|
|
nanospec |
$ 1,558.00 |
|
1" N2 Gas Lines |
$ 20,300.00 |
|
|
|
|
|
|
microscopes |
$ 2,982.00 |
|
HAZCOM Upgrade |
$ 1,371.00 |
|
|
|
|
|
|
profilometer |
$ 1,235.00 |
|
411 Cory Upgrade |
$ 15,988.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
$
50,104.00 |
|
Total |
$
32,075.00 |
|
|
Total |
$
68,259.00 |
|
|
|
|
rs 12/04
Grand Total $1,716,907.00 |
|
|
|
|
|
|
Table 4. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|