CSM-01
The Competitive Semiconductor Manufacturing Survey: Results of the Pilot Phase. M. Borrus and R. Leachman (May 1992)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-02
The Competitive Semiconductor Manufacturing Survey: FIRST REPORT on the Results of the Main Phase. R. Leachman and D. Hodges, Editors (April 1993)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-03
Data Envelopment Analysis: Review of Standard Techniques, Interpretations, and Extensions. B. Saeed and R. Leachman (March 1993)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-04
(Superseded by CSM-25)
 

CSM-05
Database Design for the Competitive Semiconductor Manufacturing Program. R. Benson, S. Cunningham and L. Sattler (June 1993)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-06
DORIC: Design of Optimized and Robust Integrated Circuits. Z. Daoud (December 1993)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-07
The Statistics of In-Situ Particle Monitoring. C. Spanos, C. Cunningham and L. Smith (January 1994)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-08
The Competitive Semiconductor Manufacturing Survey: SECOND REPORT on the Results of the Main Phase. R. Leachman, Editor (September 1994)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-09
The Competitive Semiconductor Manufacturing Human Resources Project: First Interim Report. C. Brown, Editor (September 1994)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-10
Semiconductor Yield Improvement: Results and Best Practices. S. Cunningham, C.J. Spanos, and K. Voros (September 1994)
[See an Abstract of this Report]       Purchase this Report]
 

CSM-11
Empirical Results on the Relationship Between Probe Yield and Cycle Time in Semiconductor Wafer Fabrication. S. Cunningham and S. G. Shanthikumar (September 1994)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-12
Automated Incremental Production Planning Techniques for the Semiconductor Industry. R. Benson (October 1994)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-13
Collaborative Gains and Hazards in the Technology Sourcing Decision. A.A. Shuen (September 1995)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-14
Technology Sourcing and the Boundaries of the Firm. A.A. Shuen (September 1995)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-15
Learning Through Technology Partnerships in Semiconductor Component Packaging. A.A. Shuen (September 1995)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-16
The Components of the Learning Curve in Semiconductor Fabrication Processes. A.A. Shuen (September 1995)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-17
Assessing Best-In-Class Performance of Semiconductor Manufacturers. B. Saeed (May 1994)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-18
Production Planning and Scheduling Practices Across the Semiconductor Industry. R. Leachman (September 1994)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-19
Benchmarking Manufacturing Performance in the Semiconductor Industry. R. Benson, S. Cunningham, and R. Leachman (December 1994)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-20
Participative Management: An Analysis of the Semiconductor Manufacturing Industry. V. Sohoni and L. Sattler (December 1994)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-21
Closed-Loop Measurement of Equipment Efficiency and Equipment Capacity. R. Leachman (January 1995)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-22
A Systems View of Work Performance: An Example From Semiconductor Manufacturing. D. Bowen (May 1995)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-23
Empirical Techniques for Analyzing Organizations: An Examination of the Semiconductor Industry. L. Sattler (Dissertation, 160 pp) (May 1995)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-24
IMPReSS: An Automated Production Planning and Delivery Quotation System at Harris Corporation - Semiconductor Sector. R. Leachman, R. Benson, C. Liu and D. Raar (August 1995)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-25
The Development and Use of In-Line Yield Estimates in Semiconductor Manufacturing. S. Cunningham (Dissertation, 180 pp) (September 1995)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-26
Production Planning and Scheduling for Semiconductor Device Testing. T. Carmon (Dissertation, 200 pp) (September 1995)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-27
Benchmarking Semiconductor Manufacturing. R. Leachman and D. Hodges (October 1995)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-28
Process Innovation and Learning By Doing in Semiconductor Manufacturing. N. Hatch (Haas School of Business) (December 1994)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-29
Investment in Learning Capital: Enhancing the Rate of Learning in Semiconductor Manufacturing. N. Hatch (Haas School of Business) (December 1994)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-30
(Superseded by CSM-37)
 

CSM-31
The Competitive Semiconductor Manufacturing Survey: THIRD REPORT on the Results of the Main Phase. R. Leachman, Editor (August 1996)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-32
The Competitive Semiconductor Manufacturing Human Resources Project: Second Interim Report. C. Brown, Editor (September 1996)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-33
Learning Effects in Semiconductor Fabrication. N. Hatch (June 1996)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-34
An Evolutionary Approach to Inter-Firm Innovation: A Study of a US-Japanese Semiconductor Partnership. A.A. Shuen (August 1996)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-35
Adaptive In-line Sampling Strategies for Semiconductor Manufacturing. W.W. Kuo (January 1997)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-37
Managing the Development and Transfer of Process Technologies in the Semiconductor Manufacturing Industry. M. Appleyard, N. Hatch, D. Mowery (Haas School of Business) (May 1997)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-38
The Competitive Semiconductor Manufacturing Human Resources Project: The Final Report (Phase I). M. Appleyard, N. Hatch, D. Mowery (Haas School of Business) (May 1997)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-39
After-Sales Service and Support Provided by the Semiconductor Equipment Industry. by R. Leachman, Editor (December 1997)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-40
National Performance in Semiconductor Manufacturing. by R. Leachman, and C. Leachman (November 1997)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-41
Field Study of Overall Equipment Efficiency (O.E.E.) Measurement of 5x Steppers. by R. Leachman, and T.-Y. Liu (April 1998)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-42
Productivity Metrics for Flexible-Sequence Cluster Tools by David Busing, and R. Leachman (May 1998)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-43
Performance and Innovation in the U.S. Semiconductor Industry 1980-1996 by Jeffrey T. Macher, David C. Mowery, and David A. Hodges (March 1998)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-44
Performance Models of Theoretical and Average Process Times for Selected Semiconductor Fabrication Equipment by Robert C. Leachman, David Busing, David Cruikshank, Ting-Yun Liu, David Moore, and Joanne Woo (June 1999)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-45
Proposed Revision to SEMI's Standard for Definition and Measurement of Equipment Productivity. by Robert C. Leachman, David Busing (June 1999)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-46
Automated Procedures for Characterizing Specific Equipment Productivity Losses with Applications in the Semiconductor Manufacturing Industry by David Paul Busing (February 1999)
[See an Abstract of this Report]       [Purchase this Report]
 

CSM-47
Understanding Fab Economics by Robert C. Leachman, John Plummer, and Nancy Sato-Misawa (June 1999)
[See an Abstract of this Report]       [Purchase this Report]    [Download 'Fab Expense and Delay Cost Models']
 

CSM-48
Trends in Worldwide Semiconductor Fabrication Capacity by Robert C. Leachman, and Chien H. Leachman (June 1999)
[See an Abstract of this Report]       [Purchase this Report]
 
 
CSM-49
Mathematical Optimization of Semiconductor Production Planning by Robert C. Leachman (October 2000)
[See an Abstract of this Report]       [Purchase this Report]

 

CSM-50
E-Commerce and the Changing Terms of Competition in the Semiconductor Industry by Robert C. Leachman, and Chien H. Leachman (October 2000)
[See an Abstract of this Report]       [Purchase this Report]

 

CSM-51
Learning by Using in Semiconductor Manufacturing: The Role of Local Information and Problem Solving Capabilities by Paolo Palezzato (Fall 2000)
[See an Abstract of this Report]       [Purchase this Report]

 

CSM-52
Competitive Semiconductor Manufacturing: Final Report on Findings from Benchmarking Eight-inch, sub-350nm Wafer Fabrication Lines by Robert C. Leachman (March 31, 2002)
[See an Abstract of this Report]       [Purchase this Report]

 


Competitive Semiconductor Manufacturing (CSM) Program
Engineering Systems Research Center, 3115 Etcheverry Hall
University of California, Berkeley, CA 94720-1750
Telephone# TBA | Fax# (510) 643-0966
 
 

TO ORDER CSM REPORTS:
Go to our on-line order form CSM Order Form or Contact csm@newton.berkeley.edu


Last updated 04/10/02 by John Tast